Page 1: the general request
The purpose of the Ship Time
Request is to give you practice in describing your cruise needs very precisely
and succinctly so that a Marine Operations group could adequately plan for
your needs. This 2-page-long document should take considerable thought and
probably a significant amount of chart work in order to provide all of the
necessary information. Ship Time
Requests also form the basis of a request to Pooled Equipment for support of
all of the class projects. The Request
should tell a reader what you’re doing, where you’re going, what you need, and
how much time your observations will require.
1. Principal Investigator:
Justin
Bergquist, Brandon Knox-Co-investigator,
2. Project Title: Sediment Accumulation Rates in the West Arm of
Glacier Bay based on lead 210 analysis
3. Platform required (circle):
R/V Thompson
4. Geographic Area(s) of Research (please attach a chartlet):
See
Chase’s Google earth chart statons 8, 10, 12, 16 and 22
5. Shipboard Equipment Required (circle):
Designate
each required piece of equipment. Be
very specific.
Bathy CTD WinFrog IMET Hiab crane
EM300 Aux.
Winch Trawl wire .680 wire Portable
Capstan
Kevlar line Rad van Walk-In Coolers (temp 0-4 degrees Celsius) ADCP Thermosalinograph
6. CTD sensors required:
Name
each component that you will need.
Sensors are frequently taken off the CTD for calibration if users don’t
request that they be made available.
Niskin
Bottles (# and size) Fluorometer Transmissometer PAR O2 pH
7. Pooled Equipment Required:
Van
Veen Grab sampler
8. Non-Pooled Equipment Required (note source or location):
Kasten
Corer and x-ray trays
9. Time Considerations and Constraints (tides, currents, night/day):
No
time restrictions
10. Operational Summary
Would
like to sample in order:station #’s 12, 10 ,8 ,22 and 16. Each station should take no more than two
hours for Kasten Core sampling. The
other two hours of work can be done while the ship is traveling
Ocean 443: Ship Time Request
Page 2: Details of Ship Use
Operational Summary: Give all details needed by the Planning
Groups in order to address your operational and data-gathering needs.
|
Station |
Latitude |
Longitude |
Equipment to be used |
Time |
Time constraints (be
specific) |
|
12 |
58.03 N |
137.01 W |
Van Veen Kasten Corer |
2 hours |
None |
|
10 |
58.89 N |
136.83 W |
VV KC |
2 hours |
None |
|
8 |
59.86 N |
136.59 W |
VV KC |
2 hours |
None |
|
16 |
58.89 N |
136.09 W |
VV KC |
2 hours |
None |
|
22 |
58.65 N |
136.36 W |
VV KC |
2 hours |
None |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional Comments as